How much space and time required to build a nuclear reactor just before a solar power plant

How much space and time required to build a nuclear reactor just before a solar power plant?

So I'd like given the cost, time to build the KW / h and space producing a nuclear reactor requires. And the same for a single solar power plant. (All statistics of each must be of a whole, but everyone has to be the same one) is self-directed task due in today, but I just wanted know the answer at the end.

This is a question fraught with many right answers. I'll take a stab at it though. The largest photovoltaic plant proposal the world is in Victoria, Australia and is estimated to produce 154 megawatts. It used 2,000 acres of land. Instead, the station in Kashiwazaki-Kariwa nuclear Japan is the largest nuclear power station in the world. It produces a little over 8,000 megawatts and employs 1037 acres of land. Using these two extreme examples, energy Nuclear energy produces about 100 times more per hectare than solar energy. Possibly, nuclear plants are even cheaper to build than the stations solar energy. The cost of photovoltaic cells is still high that the technology has not improved enough to reduce their cost. There are many other factors come into play that complicate the decision of what is ultimately the cheapest solution for energy production. Factors such as the cost of land, the environmental impact of land use, longevity of the facility, long-term environmental effects, etc.. I can not answer how much each of the costs of building and construction time. Let us know what happened.

Being environmentally friendly http://blog.environment-green.com/

My Solar Power Back Up System For House & Shop OFF THE GRID part 2